15.42.060 - APPROVAL STANDARDS

A. New Development Requirements: All new development shall provide protection for the quality of the waters of the State of Washington by the application of Best Management Practices and/or Source Controls.

All new development that requires either a building permit or has a land disturbance area greater than 500 sf shall at a minimum comply with Minimum Requirement #2 within BMC Section 15.42.060 F, all other applicable federal, state, and local ordinances, codes and regulations for stormwater management, and shall obtain a stormwater permit from the City of Bellingham prior to commencement of activity. In addition, New Development that exceeds certain other thresholds, as further identified herein, shall be required to comply with additional Minimum Requirements as follows.

1. The following new development shall comply with Minimum Requirements #1 through #5 within BMC Section 15.42.060 F:

2. The following new development shall comply with Minimum Requirements #1 through #10 within BMC Section 15.42.060 F: B. Redevelopment Requirements: All redevelopment shall provide protection for the quality of the waters of the State of Washington by the application of Best Management Practices and/or Source Controls.

All redevelopment that requires either a building permit or has a land disturbance area greater than 500 sf shall at a minimum comply with Minimum Requirement #2 within this BMC Section 15.42.060 F, all other applicable federal, state, and local ordinances, codes and regulations for stormwater management and shall obtain a stormwater permit from the City of Bellingham prior to commencement of activity. In addition, all redevelopment that exceeds certain thresholds, as further identified herein, shall be required to comply with additional Minimum Requirements as follows:

1. The following redevelopment shall comply with Minimum Requirements #1 through #5 within BMC Section 15.42.060 F for the new and replaced impervious surfaces and the land disturbed:
C. If the runoff from the new impervious surfaces and converted pervious surfaces is not separated from runoff from other surfaces on the project site, the stormwater treatment facilities must be sized for the entire flow that is directed to them.

D. On a case by case circumstance, the Minimum Requirements in BMC Section 15.42.060 F may be met for an equivalent (flow and pollution characteristics) area within the same site. For public road projects, the equivalent area does not have to be within the project limits, but must drain to the same receiving water. Approval of equivalency shall be determined by the Public Works Director or his assignee.

E. Additional Requirements and Allowances for New and Redevelopment:

F. Minimum Requirements for Stormwater Mitigation: The following are considered the minimum requirements for stormwater mitigation
7. Minimum Requirement #7 - Flow Control: G. Financial liability / Public Nuisance Declared: In addition to other remedies, failure to install and/or maintain stormwater facilities as required in this Chapter and applicable permits is hereby declared to be a public nuisance, subject to abatement as provided by applicable laws of the City or the State of Washington. The property owner and all persons engaged in development or land-disturbing activity shall be liable, jointly and severally, for all costs incurred by the City in any public nuisance action taken hereunder, or on account of damage or threatened damage to City property or facilities or water bodies, or associated with remedial actions necessitated by the failure to install and/or maintain required stormwater facilities.

[Ord. 2009-06-041; Ord. 2006-05-047]