
The City’s Comprehensive Sewer Plan identified remote storage as the Best Management Practice for addressing wet weather peak flows, and called for a 1.7 million gallon storage facility to control projected Combined Sewer Overflows (CSO’s). To accomplish this, a location study, sufficient preliminary design and site evaluations need to be generated to accomplish comparative economic, environmental and societal (Triple Bottom Line) parameters, and arrive at a recommended site location.
Six potential sites were identified in and around the City’s downtown core
and property owned by the Port of Bellingham. Further study narrowed the
recommended sites to the three located on the Vicinity Map.
Accomplishments: Staff review of draft facility location study. Public meeting held 1/21/2010 to discuss location study.
Next Milestones: Finalize location study.
Central Business District
Lettered Streets
Sehome
York
Sam Shipp
Engineering Manager
Phone: (360) 778-7900
Email Public Works
No photos available