James Street Bridge Replacement and Road Improvements

Vicinity Map

Project Overview: ER-0009 and ES-0318

James Street Bridge Replacement  Pre-constructionThis project will replace three culverts as part of the 2006 bridge maintenance report. The bridge and bridge approach will include full curb, gutter, sidewalk and bike lanes.  The project will coordinate with the Bay to Baker Trail and future road improvements.

Road Improvements will include a continuous left-turn lane, sidewalks, street trees and street lights near Sunset Pond Park and north to Orchard Street

Status - March 2012

Accomplishments: 90% plan/specification submittal due the week of 04/09/12. NEPA draft permit documents currently being reviewed. Signed contract with Greenroads for certification process for Orchard Street to Sunset Park including the bridge replacement.  Construction will be delayed until 2013 so that the timing can be better coordinated with creek relocation.

Next Milestones: Finalize design plans/specifications. Incorporate "green" components to the project through the materials specified. 90% plan submittal.

Affected Neighborhoods

Mt. Baker
King Mountain

Project Manager

Craig Mueller. P.E.
Project Engineer
Phone: (360) 778-7900
Email Public Works