2009-2010 Water Main Replacement Program 

Vicinity Map

Project Overview: EW-0176Preconstruction

The 2009 Water Main Replacement project is part of an annual program to replace aging water mains that are at the end of their lifecycle and require upgrades.  The 2009-2010 project consists of removing and replacing 2.5 blocks of 1928 cast iron pipe along 12th Street from McKenzie Avenue to Old Fairhaven Parkway and two blocks along Cowgill from 10th to 12th streets.. After the pipe is replaced, pavement resurfacing from Mill Avenue to the Padden Creek bridge will complete the project.  Concrete will be placed in the heavily used bus stop segment. Minor sewer rehabilitation will take place as manholes are repaired. See the construction flyer for additional information.

.

Update - September 2011

Accomplishments: Completed the second surfacing of the failed asphalt, and contractor completed raising iron to grade and pavement markings. Final walk through inspection held on 8/4/11. Completed punch list and close out.

Next Milestones:

Affected Neighborhoods

For current road restrictions and closures, visit our home page.

Fairhaven
Edgemoor

Project Manager

Ravyn Whitewolf, Engineering Manager
Project Engineer
Phone: (360) 778-7920
Email Public Works

Project Details

Construction Photographs

12th and Larrabee Streets circa 1907  12th and Larrabee Street June 2010  Preconstruction June 2010  July 2010  Manhole Inatallation  Manhole Installation  Watermain Crossing 2010  Sidewalks  Sidewalks  Sidewalks  Manhole Placement  Pulling Manhole Box  Brick Removal  Brick Removal on Harris Street  12th Street  12th Street  Bricks on Harris  Bricks on Harris  Concrete Paving  Concrete Work  Concrete Work  Concrete Work  Concrete Work  Concrete Work  Concrete Work  Replacing Bricks  Paving