Skip to page contents
City of Bellingham, WA
Contact Us Site Map
You are here: Home) Government ) Departments ) Public Works ) Projects ) Completed Capital Projects ) 2009-2010 Sewer Replacements - Trenchless

2009-2010 Sewer Replacements - Trenchless 

Vicinity Map 2009-2010 Sewer Replacements

Project Overview: EU-0150

The 2009-2010 Sewer Replacement project consists primarily of replacing manholes and restoring sanitary sewer lines to near new condition through the use of trenchless technology and open cut methods in portions of seven neighborhoods (see map link by neighborhood below.)  Eighty-five manholes will be replaced or rehabilitated and more than 18,000 linear feet of pipe will be repaired using trenchless cured-in-place pipe (CIPP). CIPP rehabilitates the existing sewer line by inserting a resin coated cloth liner with pressurized steam.  The resin coated liner is then heated with the steam to activate the resin. The hardened resin creates a pipe inside the existing pipe.  Additional information about CIPP is available by following this link: http://www.insituform.com/content/190/how_insituform_cipp_is_installed.aspx

Status - August 2010

Accomplishments: Project is substantially complete. Final inspection held 6/25/10.

Next Milestones: Close out.

Affected Neighborhoods

Edgemoor (map)
Columbia (map)
Birchwood (map)
York -Sehome (map)
Central Business District (map)
Whatcom Falls (map)

Project Manager

Ravyn Whitewolf
Project Engineer
Phone: (360) 778-7900
Email Public Works

Project Details

Construction Photographs

Sliplining    Willow

 

Top of Page ^ Top of page