2009
Neighborhood Traffic Calming is the annual program to introduce traffic
calming measures for increased safety for motorized and non-motorized
traffic. Areas are prioritized based on citizen input, accident and vehicle
counts. This year's project includes two trail crossings, one located on
Pacific St where the railroad trail crosses the streets and the other is
located Broadway where the old village trail terminates before Elizabeth
Park. The Pacific St location was included in the 2008 program, but was not
completed due to lack of funding. The purpose of the projects is to
improve pedestrian safety and slow down traffic.
Accomplishments: Construction is substantially complete.
Next Milestones: Closeout
Lettered Streets, Columbia, Roosevelt
Freeman Anthony, P.E.
Project Engineer
Phone: (360) 778-7900
Email Public Works