The
2008-2009 Sewer Replacement project consists of the replacement of the 1958
concrete and 1914 vitrified clay sewer main on Lincoln Street from Lakeway
Drive to the I-5 overpass. The design includes lowering the sewer line at
York Street such that a future sewer line can be installed under Lincoln
Creek to Moore Street. Replacement of aging sewer lines also addresses
issues related to inflow and infiltration (I&I). This would allow existing
services that are currently pumped under the creek to be removed some time
in the future. The project also includes the replacement of two private
sewer laterals that are located in City alley rights-of- way. These are
located between Franklin and Grant Street north of Edwards Street and
between Indian Street and Jersey Street north of Myrtle Street. This is in
response to previous Council direction to replace all qualified private
sewer laterals as part of our sewer replacement program (per Resolution
2008-36).
Accomplishments: Sewer installation and road restoration on Lincoln Street complete.
Next Milestones: Closeout.