2007 Public Works Department Objectives with Accomplishments

Administration

1) Proceed with implementation of the Waterfront Redevelopment Master Plan and Development Agreement by moving forward on design of the infrastructure improvements. (Council Goals 3, 4, 5, 6, 7 and 8)

2) Design a new building to house Public Works for a more efficient operation, and to make space available to meet the needs of other City departments. (Council Goal 1)

3) Begin implementation of new/revised departmental work flow and business practices from findings and results identified in the 2006 Computer Maintenance Management Program. (Council Goal 1)

Treatment Plants

Post Point Pollution Control Plant

4) Investigate potential for sludge pyrolysis technology (heating sludge without oxygen to produce a burnable gas) to replace solids incineration process. Pyrolysis process may reduce solids volume to same degree as current incinerator process as well as yield substantial natural gas reduction along with potential for "green" power generation. (Council Goals 1 and 6)

5) Complete an assessment of effluent quality characteristics and initiate a hydraulic assessment of the flow volumes from the secondary bypass system at Post Point. This secondary bypass effluent flows through the alternate outfall to the north of the primary treatment plant outfall in Bellingham Bay. (Council Goals 1 and 6)

Water Filtration Plant

6) Conduct a pilot filter testing study on a new polymer coagulant aid and write specifications derived from the study to purchase the most effective coagulant. (Council Goals 1 and 2)

7) Evaluate the new chemical induction unit on the raw water influent source by testing several parameters through a range of operational procedures and purchase new unit for redundancy. (Council Goals 1 and 2)

Water / Wastewater Utilities

Water

8) Implement a strategic plan to enhance the City's water distribution flushing program to use unidirectional flushing methods to maintain water quality throughout the network and to conserve water within the system. (Council Goal 1)

9) Continue to improve on the City's voluntary metering program by using public service announcements and educational programs to explain the benefits of metering. (Council Goal 9)

Wastewater

10) Develop a Fats, Oils, and Grease (FOG) control program that focuses on best management practices, removal/replacement of deficient systems and development and implementation of a monitoring system to ensure compliance. (Council Goal 1)

11) Develop a wastewater collection system-wide program that identifies high maintenance areas in order to reduce back-ups and to effectively identify where maintenance improvements are necessary. (Council Goal 1)

Maintenance Operations

Street Maintenance

12) Develop and implement a new maintenance management system that will improve scheduling planned maintenance with system priorities and integration with growth and development plans. (Council Goal 1)

SStorm and Surface Water Maintenance

13) Using the finding from the first year stormwater collection system scanning program, implement a program of systematic improvements to recondition the stormwater collection system. (Council Goal 1)

Solid Waste (Was listed as #30 in the wrong location in the 2006 Adopted Budget)

14) Continue to monitor the Clean Green fee structure to ensure that it reflects the intent of the inter-local agreement with Whatcom County and is adequate to provide proper financial support to operate the facility to the best interests of the community. (Council Goal 1)

Purchasing, Materials Management

Warehouse

15) Complete enhancements to ECity software by the end of the third quarter.

16) Barcode all inventory by the end of second quarter.

Supervision and Technology

Technical Services

17) Initiate technology and business practice changes outlined in the department’s information management master plan. (Council Goal 1)

18) Evaluate placing infrastructure maps and information on the website for public information self service. (Council Goal 9)

19) Develop new procedures and processes to take advantage of the department’s new touch and radio meter reading system. (Council Goal 1)

20) Evaluate the Geographic Information System (GIS) services provided to other City departments and the community to ensure adequate services are provided. (Council Goal 1 and 9)

21) Provide comprehensive coordination, analysis and reporting for the water, wastewater, stormwater, street, alley and sidewalk replacement/upgrade program. (Council Goal 1)

22) Enhance the mapping and tracking of City owned and managed properties. (Council Goal 1)

Facilities Operations

23) Implement Green Clean program in custodial services. Choose new Green Seal certified cleaning products to use in cleaning for health, safety and protection of the environment. Train custodial staff in methods and use. Monitor effectiveness of the program through City employee input and by tracking cost effectiveness. (Council Goal 1)

24) Implement an energy management Program for City facilities. Investigate options for monitoring and control of power, heating, ventilation, and air conditioning systems. Install computer based system(s) and train Facilities Maintenance staff. Set guidelines and procedures for maintaining energy efficiency. Continue energy conservation capital equipment programs and measure effectiveness. (Council Goal 1)

25) Increase recycling programs in all Facilities-run buildings – A test program was in place for 2006. (Council Goal 1)

Transportation Management

CCommunications

26) Re-structure 800 megahertz radios to utilize lower end of the 800 band to reduce interference with NEXTEL and comply with a Federal Communications Commission (FCC) order. (Council Goals 1 and 7)

27) Design and install Smartlink 800 megahertz radio system upgrades to provide seamless interoperability between differing sites and channels. (Council Goal 7)

Street Lighting

28) Purchase and install new street lighting along Alabama Street to replace failing standards and improve the overall appearance of the corridor. (Council Goals 1 and 7)

Signals

29) Upgrade 20 signalized intersections along major commuter routes with Intelligent Transportation System (ITS) components. (Council Goal 7)

30) Perform a corridor study along Sunset Drive between I-5 and Orleans Street to develop and implement a signal coordination program to improve the efficiency of the City’s second busiest arterial street. (Council Goal 7)

Parking

31) Develop a merchant validation system for customer use in both on-street meters and pay stations. (Council Goal 7)

32) Transfer to computerized billing system with web interface and point-of-sale accountability for permit sales to increase accountability, communication and customer convenience. (Council Goal 1)

33) Develop and maintain a comprehensive website as a resource for parking issues and to facilitate contact with and communication to the Bellingham Parking Commission. (Council Goal 9)

34) Develop residential parking program to maximize use of City parking facilities 24 hours a day and support continued mixed-use development downtown. (Council Goals 1 and 7)

Engineering Services

Design and Construction

35) Manage, design, and construct two replacement utility projects, one pavement resurfacing project and at least one pedestrian/bicycle improvement project as part of the capital improvement program in a manner that preserves and enhances the quality of life for our citizens. (Council Goals 1 and 7)

36) Complete first phase renovation of the Federal Building utilizing $2.61 Million of federal funds received for that purpose. (Council Goal 6)

37) Complete design and right-of-way acquisition for Phase II of the Sunset Drive project. (Council Goals 1 and 7)

38) Create and implement a communication plan for Public Works capital projects to engage neighborhood input and participation on upcoming projects. (Council Goal 9)

39) Implement two traffic calming projects that improve safety of neighborhoods while maintaining City-wide circulation of vehicular traffic. (Council Goal 5 and 7)

Development Administration

40) Identify and pursue grant and loan opportunities for priority City projects. (Council Goal 1)

41) Continue to refine the Permit Center to streamline and coordinate the permitting process by close interaction with Permit Center staff. (Council Goal 1)

Transportation

42) Provide annual update for the Transportation Impact Fee schedule and the 6-Year Transportation Improvement Plan. (Council Goal 7)

43) Explore, prioritize, construct, and encourage transportation alternatives throughout the City including bike lanes, sidewalks, trails, safe school routes, and Whatcom Transportation Authority (WTA) facilities through ongoing coordination with WTA, Bellingham School District, Bellingham Parks and advisory commissions as well as coordination of public and private development projects. (Council Goal 7)

44) Implement and monitor the City concurrency policies and programs in support of Council-approved growth scenarios by individual project review, and provide annual report to Council. (Council Goal 7)

Water and Sewer Utilities

45) Develop implementation plan for recommendations contained in the updated Water Comprehensive Plan. (Council Goals 1 and 2)

46) Complete the Wastewater Comprehensive Plan and begin development of implementation plan. (Council Goal 1)

Storm and Surface Water Utility Services

Stormwater Engineering

47) Using the updated Stormwater Master Plan, develop a 6-year and 20-year implementation plan for capital projects (50% complete in 2007). (Council Goal 1)

48) Create and submit a compliance schedule for the Municipal Stormwater National Pollution Discharge Elimination System (NPDES) permit (subject to Department of Ecology permit issuance). (Council Goal 1)

Project Development

49) Retrofit two stormwater outfalls in the Lake Whatcom Watershed to treat existing developed areas. (Council Goal 1)

50) Report on water quality conditions of 20% of the stormwater outfalls within the City. (Council Goals 1 and 2)

Development Review and Inspection

51) Complete maintenance inspections on 20% of all private stormwater facilities within the City. (Council Goal 1)

Stormwater Education

52) Provide one workshop for developers and engineers regarding stormwater regulations. (Council Goal 9)

Environmental Services

Policy

54) Implement the 2007 Lake Whatcom Reservoir Management Program. (Council Goals 1 and 2)

55) Conduct watershed properties land management and restoration activities on 10% of the properties. (Council Goal 2)

56) Implement Climate Protection Phase I report. Develop Phase II report. (Council Goal 1)

57) Complete and implement Middle Fork Instream Flow negotiated agreement. (Council Goal 1)

58) Complete permitting and design phase, and begin reconstruction of the Nooksack Diversion Dam that continues supply of drinking water and provides safe fish passage (complete in 2008). (Council Goals 1 and 2)

Education

59) Provide community outreach programs in the Lake Whatcom Watershed, with focus on Total Maximum Daily Load (TMDL) response planning, stormwater retrofit programs, and land stewardship. (Council Goal 9)

60) Produce 2007 Drinking Water Consumer Confidence Report. (Council Goal 9)

61) Provide public involvement and education support for Middle Fork instream flow negotiations, the Middle Fork Passage and Water Withdrawal Project, and the Middle Fork Habitat Conservation Plan. (Council Goal 9)

Restoration

62) Implement urban stream restoration elements of the 2005 Centennial grant. (Council Goal 2)

63) Implement Whatcom Creek Restoration Settlement restoration, monitoring and maintenance projects. (Council Goal 2)

64) Implement year one of the 6-year restoration project plan. (Council Goal 2)

65) Identify and develop two habitat restoration projects in Bellingham Bay through the Bellingham Bay Action Team. (Council Goal 2)

Watershed Acquisition and Property Management Services

Lake Whatcom Land Acquisition

66) Identify, prioritize, and purchase watershed properties utilizing at least 80% of the available budget. (Council Goal 2)

Additional Accomplishment