| Solicitation # | Closing Date | Solicitation Name | Description |
|---|---|---|---|
68B-2009 | 07/23/2009 | Elevator Maintenance and Repair Services | Elevator Maintenance and Repair Services |
62B-2009 | 07/16/2009 | Northridge Park Phase 2, PD2014-2C | The improvement consists of trail construction and involves: mobilization, refined trail layout based on Owner’s construction survey, construction and tree protection fencing, temporary erosion and sedimentation controls, clearing, grubbing, excavation, fill, grading & drainage, trail ballast, crushed surfacing base & top courses, rail fence, prefabricated concrete steps, boardwalk & guard rail, asphalt parking area, portland cement concrete walkway, cast in place steps and handrails, wood chip mulch, wetland-mitigation-related & non wetland plantings, site restoration, lighting, park signage, fold down bollards and park benches. |
47B-2009 | 07/14/2009 | Whatcom Medic One Medical Supplies | Provide Medical Supplies for Whatcom Medic One operations. |
63B-2009 | 07/09/2009 | Fraser Street Phase 3 ES-386 Bicycle and Pedestrian Improvements. | Roadway widening of approximately 1050 LF of existing roadway to accommodate bike facilities, installation of an illumination system, and the installation of approximately 980 LF of timber framed elevated pedestrian boardwalk. Work includes, but is not limited to, site clearing, grading, geocell embankment installation, roadway construction, pin pile installation, timber framing and other associated construction. |
65B-2009 | 07/09/2009 | Service Body - Provide and Install | Supply and install service body on City supplied 2009 Ford F-550 truck chassis. |
71B-2009 | 07/06/2009 | Fleet Shop Overhead Doors | Replace Fleet Shop Overhead Doors |