| Solicitation # | Closing Date | Solicitation Name | Description |
|---|---|---|---|
1B-2010 | 03/01/2010 | On Call Roster for Professional Services | On Call Roster for Professional Services |
10B-2010 | 02/22/2010 | Design Services for Water & Wastewater SCADA / CMMS System Upgrades | Design Services for Water & Wastewater SCADA / CMMS System Upgrades |
6B-2010 | 02/18/2010 | Cable System Franchise Renewal-Consulting Services | Cable System Franchise Renewal-Consulting Services |
11B-2010 | 02/16/2010 | Traffic Signs and Sign Materials | Traffic Signs and Sign Materials |
7B-2010 | 02/12/2010 | Liquid Chlorine | Liquid Chlorine for Water Treatment and Wastewater Treatment Plants |
104B-2009 | 02/11/2010 | Willow Spring at Squalicum Creek Park EN-26 project | This is a fish habitat enhancement project that will create a groundwater-fed constructed stream channel that will flow to Squalicum Creek, a tributary to Bellingham Bay. The project consists of a groundwater collection system and drainage pipe, grading of a stream channel and installation of natural rock and log features. Construction incudes, but is not limited to, the installation of PVC and HDPE pipe, trench excavation, excavation and grading, trail construction and footbridge installation, natural feature installation, and connection to existing channels. This project connects to a salmon bearing stream; specific regulations, requirements and date restrictions apply. |
95B-2009 | 02/11/2010 | West Illinois/Timpson Way St. Extension ES-310, Fed#TA-3349 | The project will widen and overly approximately 1,110 LF of existing pavement between Nome Street and the existing western terminus of West Illinois Street. The project will also construct approximately 1,340 LF of new roadway connecting West Illinois Street to Marine Drive. The improvements include two 11-foot travel lanes, two 5-foot bicycle lanes, storm water infrastructure including curb and gutter on both sides, and sidewalk. Other elements of the project will include excavation, fill and grading activities, construction of two retaining walls, crosswalks and signage. |
105B-2009 | 02/09/2010 | Cordata Park Phase 1 Trails | Construction of a new crushed limestone trail, pedestrian bridge and boardwalk. Work includes installing and maintaining TESC, clearing, grubbing, stockpiling native topsoils, grading, logging, wetland protection and planting, mulching, and all other work shown in the plans and specifications. |